Blooming 9 patch day 4

It finally occurred to me that at the rate I’m going (about one row per day) it will take me a total of 28 days to finish this top.

I’m still torn about whether to iron seams to the side or seams open.  To the non-quilter this means nothing.  But I’m learning that in the quilt world there are two great debates with passionate advocates on both sides.  And those debates are “pre-wash fabric or not” and “seams pressed to the side or seams pressed open”.

Advertisements

About 365daysofnoro

We love to knit with Noro yarns
This entry was posted in blooming nine patch. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s